Home Shaft Cutter Ship Cutter Tef-Gel Spacer Shaft Seals Dealer Locator Boat Shows Contact Us

 

INSTALLATION REQUIREMENTS FOR FIBERGLASS STRUT!
INSTALLATION REQUIREMENTS FOR FIBERGLASS STRUT!
 INSTALLATION REQUIREMENTS FOR FIBERGLASS STRUT! INSTALLATION REQUIREMENTS FOR FIBERGLASS STRUT! Fiberglas will not support screws drilled and tapped into it. The sheering force of a line cut is too great; therefore,
        the screws that hold the holding block will pull out.

        We recommend when installing the holding block onto fiberglass that a metal plate, approximately 1/4" thick,
        be embedded into the fiberglass. The plate can be stainless steel or aluminum.

  1. The installation is achieved by first measuring to determine the depth required, then routing away the glass to receive the plate. Using stainless steel flat head screws and epoxy, mount the plate into the routed area.
  2. Drill and tap into the plate and mount the holding block.
  3. Bond the plate and holding block by screwing a small zinc anode onto the plate.

· PHOTOS BELOW ARE EXAMPLES OF A COMPLETED PLATE MOUNTED INTO FIBERGLAS.

Photo 1
                    Photo 1
Photo 2
Photo 2

PLATES CAN BE FABRICATED AT YOUR BOAT YARD TO SUIT INDIVIDUAL VESSELS

Custom fabricated holding blocks are available as in Photo #1 (above).
Please call factory at 1-800-824-5372 USA and Canada (954) 463-2707 worldwide
Dimensional details of vessel are required.

 

page 1 page 2 page 3 page 4 page 5 page 6 page 7 page 8 page 9 page 10 page 11

Spurs Marine Logo Marine Manufacturing Inc.
201 SW 33rd Street Ft. Lauderdale, FL 33315 USA
E-mail: spurs@spursmarine.com
phone: (954) 463-2707 Fax: (954) 525-0239
spurs cutters are protected by USA and International patents
 
 Spurs Marine Logo logo is a trademark of Spurs Marine Manufacturing Inc
Copyright ® All rights reserved.